Compare

Compare buildings

Icon Residence and ALIX Residences in Mont Kiara both read Poor, Icon Residence on 5.7 and ALIX Residences on 5.6. ALIX Residences was completed in 2023; Icon Residence was completed in 2014.

Ask the Guide about these

Side-by-side comparison of 2 buildings
2 of 4 places used
ALIX Residences: the towers from the street, with the ALIX sign at the gate
ALIX ResidencesMont Kiara
5.6 out of 10Poor
Icon Residence: the white stacked towers from the air, beside the highway
Icon ResidenceMont Kiara
5.7 out of 10Poor
Scores
Overall5.6Poor5.7Poor
Sentiment
Sentiment
4.4
Sentiment
7.5
Highest
Location
Location
7.8
Location
8.7
Highest
Environment
Environment
6.2
Environment
4.4
Facilities
Facilities
4.0
Facilities
2.9
Space
Space
6.0
Not scored
Building
Completed20232014
DeveloperOrchard ParkMah Sing
School drive1 min, off-peak3 min, off-peak
Google rating4.4 from 51 reviews4.5 from 84 reviews
Setting
ViewViews are a strength: the city skyline.Views are a strength: the city skyline.
CautionTraffic noise: Jalan Duta, North-South Expressway, SPRINT Highway, NKVE, Damansara-Ulu Klang Expressway (DUKE).Close to Lebuhraya DUKE (E33) (a major road): in the near-road band where traffic exhaust and dust concentrate, most of all on low floors.
2 of 4 places used
ALIX Residences: the towers from the street, with the ALIX sign at the gate
ALIX ResidencesMont Kiara
5.6 out of 10Poor

Scores

Overall
5.6Poor
Sentiment
Sentiment
4.4
Location
Location
7.8
Environment
Environment
6.2
Facilities
Facilities
4.0
Space
Space
6.0

Building

Completed
2023
Developer
Orchard Park
School drive
1 min, off-peak
Google rating
4.4 from 51 reviews

Setting

View
Views are a strength: the city skyline.
Caution
Traffic noise: Jalan Duta, North-South Expressway, SPRINT Highway, NKVE, Damansara-Ulu Klang Expressway (DUKE).
Icon Residence: the white stacked towers from the air, beside the highway
Icon ResidenceMont Kiara
5.7 out of 10Poor

Scores

Overall
5.7Poor
Sentiment
Sentiment
7.5
Highest
Location
Location
8.7
Highest
Environment
Environment
4.4
Facilities
Facilities
2.9
Space
Not scored

Building

Completed
2014
Developer
Mah Sing
School drive
3 min, off-peak
Google rating
4.5 from 84 reviews

Setting

View
Views are a strength: the city skyline.
Caution
Close to Lebuhraya DUKE (E33) (a major road): in the near-road band where traffic exhaust and dust concentrate, most of all on low floors.