Compare

Compare buildings

Bangsar Heights and Desa Bangsar Ria in Bangsar both score 7.2 out of ten. Bangsar Heights was completed in 1999; Desa Bangsar Ria was completed in 1993.

Ask the Guide about these

Side-by-side comparison of 2 buildings
2 of 4 places used
7.2 out of 10Good
Desa Bangsar Ria: the entrance drive between the blocks
7.2 out of 10Good
Scores
Overall7.2GoodHighest7.2GoodHighest
Sentiment
Sentiment
7.5
Highest
Sentiment
5.3
Location
Location
8.8
Highest
Location
8.7
Environment
Environment
7.6
Environment
7.9
Highest
Facilities
Facilities
5.3
Facilities
6.8
SpaceNot scoredNot scored
Building
Completed19991993
DeveloperIntegral PropertyUOA
School drive3 min, off-peak6 min, off-peak
Google rating4.3 from 16 reviews4.8 from 4 reviews
Market
Transacted median psfRM631 psf (2025)
2 of 4 places used
7.2 out of 10Good

Scores

Overall
7.2GoodHighest
Sentiment
Sentiment
7.5
Highest
Location
Location
8.8
Highest
Environment
Environment
7.6
Facilities
Facilities
5.3
Space
Not scored

Building

Completed
1999
Developer
Integral Property
School drive
3 min, off-peak
Google rating
4.3 from 16 reviews

Market

Transacted median psf
RM631 psf (2025)
Desa Bangsar Ria: the entrance drive between the blocks
7.2 out of 10Good

Scores

Overall
7.2GoodHighest
Sentiment
Sentiment
5.3
Location
Location
8.7
Environment
Environment
7.9
Highest
Facilities
Facilities
6.8
Space
Not scored

Building

Completed
1993
Developer
UOA
School drive
6 min, off-peak
Google rating
4.8 from 4 reviews

Market

Transacted median psf