Compare

Compare buildings

Palmyra and Vila Mutiara in Bangsar both score 6.8 out of ten. Palmyra was completed in 2004; Vila Mutiara was completed in 1999.

Ask the Guide about these

Side-by-side comparison of 2 buildings
2 of 4 places used
Palmyra: the landscaped grounds between the low-rise blocks, from an upper floor
PalmyraBangsar
6.8 out of 10Fair
Vila Mutiara: the gate beneath the Vila Mutiara name
6.8 out of 10Fair
Scores
Overall6.8Fair6.8Fair
Sentiment
Sentiment
7.0
Highest
Sentiment
6.7
Location
Location
8.6
Highest
Location
8.0
Environment
Environment
4.0
Environment
4.9
Facilities
Facilities
5.7
Facilities
5.5
Space
Space
10.0
Highest
Space
10.0
Highest
Building
Completed20041999
DeveloperBRDBMalton
School drive5 min, off-peak6 min, off-peak
Google rating4.3 from 6 reviews3.9 from 16 reviews
Setting
CautionClose to Damansara Link (E23) (a major road): in the near-road band where traffic exhaust and dust concentrate, most of all on low floors.Traffic noise: Massive traffic congestion noted in vicinity.
2 of 4 places used
Palmyra: the landscaped grounds between the low-rise blocks, from an upper floor
PalmyraBangsar
6.8 out of 10Fair

Scores

Overall
6.8Fair
Sentiment
Sentiment
7.0
Highest
Location
Location
8.6
Highest
Environment
Environment
4.0
Facilities
Facilities
5.7
Space
Space
10.0
Highest

Building

Completed
2004
Developer
BRDB
School drive
5 min, off-peak
Google rating
4.3 from 6 reviews

Setting

Caution
Close to Damansara Link (E23) (a major road): in the near-road band where traffic exhaust and dust concentrate, most of all on low floors.
Vila Mutiara: the gate beneath the Vila Mutiara name
6.8 out of 10Fair

Scores

Overall
6.8Fair
Sentiment
Sentiment
6.7
Location
Location
8.0
Environment
Environment
4.9
Facilities
Facilities
5.5
Space
Space
10.0
Highest

Building

Completed
1999
Developer
Malton
School drive
6 min, off-peak
Google rating
3.9 from 16 reviews

Setting

Caution
Traffic noise: Massive traffic congestion noted in vicinity.