Compare

Compare buildings

Waldorf Tower reads Fair (6.1) and Sunway Vivaldi Poor (5.7) in Sri Hartamas. Sunway Vivaldi was completed in 2011; Waldorf Tower was completed in 2008.

Ask the Guide about these

Side-by-side comparison of 2 buildings
2 of 4 places used
Sunway VivaldiSri Hartamas
5.7 out of 10Poor
Waldorf Tower: the tower above its podium and name sign
Waldorf TowerSri Hartamas
6.1 out of 10Fair
Scores
Overall5.7Poor6.1Fair
Sentiment
Sentiment
7.0
Highest
Sentiment
3.2
Location
Location
7.3
Highest
Location
6.8
Environment
Environment
2.7
Environment
8.4
Highest
Facilities
Facilities
7.7
Highest
Facilities
6.0
SpaceNot scoredNot scored
Median rent a month
3 bedroomsRM8,000RM4,500
Building
Completed20112008
DeveloperSunwayMayland
School drive4 min, off-peak4 min, off-peak
Setting
ViewViews are limited; units face the city skyline and neighbouring blocks.Views are a strength: the city skyline and greenery.
CautionClose to Penchala Link (E23) (a major road): in the near-road band where traffic exhaust and dust concentrate, most of all on low floors.Traffic noise: Atop busy Plaza Damas on Jalan Sri Hartamas 1.
Market
Transacted median psfRM586 psf (2024)
2 of 4 places used
Sunway VivaldiSri Hartamas
5.7 out of 10Poor

Scores

Overall
5.7Poor
Sentiment
Sentiment
7.0
Highest
Location
Location
7.3
Highest
Environment
Environment
2.7
Facilities
Facilities
7.7
Highest
Space
Not scored

Median rent a month

3 bedrooms
RM8,000

Building

Completed
2011
Developer
Sunway
School drive
4 min, off-peak

Setting

View
Views are limited; units face the city skyline and neighbouring blocks.
Caution
Close to Penchala Link (E23) (a major road): in the near-road band where traffic exhaust and dust concentrate, most of all on low floors.

Market

Transacted median psf
Waldorf Tower: the tower above its podium and name sign
Waldorf TowerSri Hartamas
6.1 out of 10Fair

Scores

Overall
6.1Fair
Sentiment
Sentiment
3.2
Location
Location
6.8
Environment
Environment
8.4
Highest
Facilities
Facilities
6.0
Space
Not scored

Median rent a month

3 bedrooms
RM4,500

Building

Completed
2008
Developer
Mayland
School drive
4 min, off-peak

Setting

View
Views are a strength: the city skyline and greenery.
Caution
Traffic noise: Atop busy Plaza Damas on Jalan Sri Hartamas 1.

Market

Transacted median psf
RM586 psf (2024)