Compare

Compare buildings

Puncak Prima reads Good (7.0) and Waldorf Tower Fair (6.1) in Sri Hartamas. Puncak Prima was completed in 2000; Waldorf Tower was completed in 2008.

Ask the Guide about these

Side-by-side comparison of 2 buildings
2 of 4 places used
Puncak Prima: the drop-off court enclosed by the blocks
Puncak PrimaSri Hartamas
7.0 out of 10Good
Waldorf Tower: the tower above its podium and name sign
Waldorf TowerSri Hartamas
6.1 out of 10Fair
Scores
Overall7.0GoodHighest6.1Fair
Sentiment
Sentiment
7.5
Highest
Sentiment
3.2
Location
Location
7.6
Highest
Location
6.8
Environment
Environment
7.4
Environment
8.4
Highest
Facilities
Facilities
5.6
Facilities
6.0
Space
Space
7.0
Not scored
Median rent a month
3 bedroomsRM2,400RM4,500
Building
Completed20002008
DeveloperMaylandMayland
School drive4 min, off-peak4 min, off-peak
Google rating4.1 from 154 reviews
Setting
ViewViews are a strength: the city skyline.Views are a strength: the city skyline and greenery.
CautionTraffic noise: Beside busy Hartamas Shopping Centre and Plaza Damas.Traffic noise: Atop busy Plaza Damas on Jalan Sri Hartamas 1.
Market
Transacted median psfRM586 psf (2024)
2 of 4 places used
Puncak Prima: the drop-off court enclosed by the blocks
Puncak PrimaSri Hartamas
7.0 out of 10Good

Scores

Overall
7.0GoodHighest
Sentiment
Sentiment
7.5
Highest
Location
Location
7.6
Highest
Environment
Environment
7.4
Facilities
Facilities
5.6
Space
Space
7.0

Median rent a month

3 bedrooms
RM2,400

Building

Completed
2000
Developer
Mayland
School drive
4 min, off-peak
Google rating
4.1 from 154 reviews

Setting

View
Views are a strength: the city skyline.
Caution
Traffic noise: Beside busy Hartamas Shopping Centre and Plaza Damas.

Market

Transacted median psf
Waldorf Tower: the tower above its podium and name sign
Waldorf TowerSri Hartamas
6.1 out of 10Fair

Scores

Overall
6.1Fair
Sentiment
Sentiment
3.2
Location
Location
6.8
Environment
Environment
8.4
Highest
Facilities
Facilities
6.0
Space
Not scored

Median rent a month

3 bedrooms
RM4,500

Building

Completed
2008
Developer
Mayland
School drive
4 min, off-peak
Google rating

Setting

View
Views are a strength: the city skyline and greenery.
Caution
Traffic noise: Atop busy Plaza Damas on Jalan Sri Hartamas 1.

Market

Transacted median psf
RM586 psf (2024)